6.14.1.6.1 m 144 36 6.14.1.7 Brick slips Infill slips between beam and block floor beams at 28.43 488mm centres Supreme coursing slips 390mm x 100mm x 40mm and Site mix mortar 1:3 builder's sand, Cemex Rugby masonry cement and Tarmac premium yellow building sand 6.14.1.7.1 m 134 28 Slips supporting beam and block floor beams Supreme 17.72
minimum strength 49N/mm square laid to slope on quarry dust and compacted SM 400 D 125 x 250 mm Splayed kerb to BS 340 including 125 x 100 mm channel on and including concrete Class 'E' foundation and 100 mm haunching to back of a kerb including all necessary excavation, formwork and disposal. LM 178 E Ditto curved to plan. LM 48
40mm thick cement and sand screen (1.3 ) m ix tambered to pattern. PLINTH (p aved areas) 600x650x50mm paving slaps. RE-ROOFING IT 5 sheets on steel structure Roof covering; fixed to slopes. 300mm Ridge / lip cap.26 Gauge galvanized metal valley gutter over valley rafters m.s; 1000mm girth overall. Allow for raking cutting to sheet ROOF STRUCTURE
Bill of Quantities – Waterproofing (Roof Slab) SI NoDescription Unit 1a Surface Preparation Preparation of the surface by mechanical abrading to remove all loose mortar and laitance, oil, grease etc., and washing with plenty of water. The rate to be inclusive of scaffolding, labour, equipment hire charges etc, all complete M2
5.3. Procurement of materials and mounting the flat roof insulation in the form of very hard mineral rock wool with 150kg/m3 density, D=20 CM, similar to type KNAUF DDP-RT. Calculated per m2. flat roof above the gymnasium and the locker room, D= 20 cm m2 420.00 5.4. Procurement of materials and mounting the flat roof
The selling price for eco slab prefabricated slabs is kes 1,600 per m2.Add cost of cement screed to level the surfaces and plaster at the bottom part of the slab. This estimates to kes 2000k per m2. Conclusion. Casting the slab in situ is at a higher cost than buying prefabricated slabs. Francis Gichuhi Kamau, Architect. Like this: Loading...
(Roof Slab) Download PDF . Waterproofing (Toilet & Sunken Slab) Download PDF . Waterproofing (Swimming Pool & Water Tank) Download PDF . Waterproofing (Podium Slab) Download PDF . Waterproofing (Basement) ... Structural Repair . Composite Fibre Wrapping . Download PDF . Basement-Waterproofing-01-1024x; Basement-Waterproofing-BOQ-1024x; …
(a) existing paving material m21,300 (b) asphalt concrete m2185 (c) kerbs m 2,950 (d) side drain m 1,800 4.4remove upto 0.1 m top soil including removal of all grass, transport to spoil and spread or transport to spoil and spread or stockpile for re-use as directed by the engineer. m31,770 item description to be carried forward to …
position MS grill made of 12 mm square bar @ 100 mm c/c bothways fixed into the walls by providing 4 nos. of holdfast in concrete bed. The frame may made of MS flat 20X3 mm. Rate to include for cost of all materials, labout, transportation, two coats of approved enamel paint over a coat of anti-corrosive paint, complete. Sft.
Bill of Quantities – Waterproofing (Roof Slab) SI No Description Unit 1a Surface Preparation Preparation of the surface by mechanical abrading to remove all loose mortar and laitance, oil, grease etc., and washing with plenty of water. The rate to be inclusive of scaffolding, labour, equipment hire charges etc, all complete M2
NMT LOT 3 BoQ - Bill No. 5 Earthworks 5.1Cut to spoil in soft. m3 4,995 5.2Cut to spoil in hard. m3 62 5.3Compact the surface in to receive approved fill or pavement material to the satisfaction of the Engineer. m2 30,015 5.4Provide, lay and compact approved fill material to formation levels in 150mm layers compacted to MDD (AASHTO T99) as ...
M2 2670 2.3.6 Ditto but for solid slab 30 cm thick for staircase slab and duct Slab. The price include the reinforced steel, all drop and inverted beams everywhere in the slab and all other materials as per specifications, drawings and supervisor engineer's instructions M2 70 2.3.7 Ditto but concrete decoration including all required materials as
vata (gola) at the junction of slab and wall/parapet/column. (vi) The following is the Acceptable Specialised Executing Waterproofing Agency. No substitutions will be permitted. IPWT Corporation, H.O. at Mumbai ; Ph : 022-25559191, 25505766 ; Fax : 022- ... coverage rate of 1.0 kg./sq.m. on the honeycomb-free, levelled plum PCC before
A quality finishing will cost you around Ksh. 30,000 per square meter for a simple house and approximately Ksh. 60,000 per square meter for a luxurious house. You can build a house with as low as Ksh. 989,000 and above. A number of other factors determine the cost of building a house. Some of the factors include:
2 Steps m 3 0.35-3 Half Landing Slab m 3 0.50-4 Half Landing Beam m 3 0.30-Stair case 02 1 Stair Waist m 3 0.70-2 Steps m 3 0.35-3 Half Landing Slab m 3 0.37-3 RCC LIFT WALL a Lift Wall 180mm thick ( 1st Floor to 2nd Floor) m 3 3.02-4 RCC Balcony Wall 100mm thick Balcony Wall m 3 1.80-5 SLAB BEAMS a B1 ( 200 x 325) m3 2.25 -
, Grade M-20 grade level slab CUM 60 b Grade M-30 for chimney shell, roof and external platforms and minishell,, SQM 50 5 of 22... CONTRACTOR PROJECT IOM EVACUATION, 3310 Gutter wall/parapet 1900 sqm 3311 Slab on fill/grade n/a sqm 3, acc s 36000 sqm 6200 Roof insulation 20mm thk with aluminum foil of 1 ....
7 Chequered Tiles - Chequerred precast cement concrete tiles 20 mm thick mix M25 over roof slab brick coba jointed with ... a Repairs to plaster of thickness 12 mm to 20 mm in patches of area 3.0 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete ...
Excavate footings size 0.4x0.4 m, 0.5 m depth and supply and poring plain concrete 1:2:4 to fix the columns PC 5 5.2 Supply and fix the column height 3.0 m above NGL, 0.5m under NGL in the first side and 2.7 m abov NGL, 0.5 m under NGL in the second side,columns support are made from steel RHS 80x40x3mm with antirust, fixed on above concrete ...
boq for a slab roof sq m kenya. DETAILED SPECIFICATIONS FOR BILL OF QUANTITIES FOR, - Know More. DETAILED SPECIFICATIONS FOR BILL OF QUANTITIES FOR INTERIOR WORKS AT BANK OF INDIA, BEDAULI BRANCH MUZAFFARPUR ZONE, for AC unit in 18mm thick MR Grade Plywood with SFT 0 0 0 Sl No Description of Item Unit Quantity Amount, …
Once the work is described, the quantity of work is worked out and taken off. It gives a detailed idea of amount of work to be performed by a contractor. The quantity of work is given in units like m3, m2, rm, foot, etc. 3. Describing The Rates. The last step in preparing a BOQ is to describe the rates of items of work per units.
PREAMBLE TO BILL OF QUANTITIES (BOQ) - UNDP. PREAMBLE TO BILL OF QUANTITIES (BOQ) 1 GENERAL The nature of this contract is measured unit price contract and the Bill of Quantities (BOQ) shall reflect this fact, B350 in Raft Foundations (Base Slab) with all required works M3 301 Ditto, but for Walls M3 268 Ditto, but for roof slab (Dome) M3 83 Ditto, but for …
Wooden Slab 1m x 12m slab 4 Roof Timber 38 x 50 x 1800mm RT rafter 5 900 Timber, BoQ VIP latrine Dimensions Depth m Diameter m Excavation of pit 4, Building bricks No 1000 River sand m3 05 Pit sand m3 15 Gravel m3 0125 Roof Cement 25kg bag 1 Chicken wire 17m x 20m m2 34 Latrine slab Cement 25kg bag 1 Domed-concrete ....
Bill of Quantities (BoQ) Page - 1 Sl. No Description Unit Quantity. Rate Amount 1 SUB HEAD: 'A': CIVIL WORK SUB HEAD-I :- EARTH WORK Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.50 m in width as well as 10 Sq.m. on plan including disposal of excavated earth lead upto 50 m and lift upto 1.50 m.
NMT LOT 2 BoQ - Bill No. 5 Earthworks 5.1Cut to spoil in soft. m3 3,540 5.2Cut to spoil in hard. m3 44 5.3Compact the surface in to receive approved fill or pavement material to the satisfaction of the Engineer. m2 17,680 5.4Provide, lay and compact approved fill material to formation levels in 150mm layers compacted to MDD (AASHTO T99) as ...
1. It offers fundamental idea of the project by providing the quantities to tenderers. 2. It states the scope of the work. (But it should be determined corresponding to drawings & specification as well). 3. It provides estimated or projected contract sum. (very crucial to client). 4. It offers a base for valuation of variation.
The standard cost of building currently is about 36,000 per square meter, according to the latest published rated from the Institute of Quantity Surveyors of Kenya, depending on finishes and location of the project. A 2 bedroom house would be say 80M2. Using this rate, it would cost you approximately 2.8M.
Hi Joyce, The cost of constructing a house basically depends on the total size of the house. The standard cost of building currently is between KES 25,000 – KES 35,000 per square meter, according to the latest published rated from the Institute of Quantity Surveyors of Kenya, depending on finishes and location of the project.
حقوق النشر © 2022.CDM كل الحقوق محفوظة.خريطة الموقع